Where should the scaffolding be alarmed?

As a minimum requirement the NSI Code of Practice NCP 115 stipulates that the entire first level (or lift) of scaffolding is fully supervised by detectors and this includes the ends of the scaffolding. Depending on the size, shape and other factors, including for example a flat roof or neighbour’s walls, additional detectors may be required for complete protection.